Linemanundergroundworld
2.53K subscribers
10:11
Pt-2 finishing up on the transferring and did a ( pull - push ) on the transformers
Linemanundergroundworld
1.8K views • 6 months ago
24:47
Construction backhoe operator dug into the electrical duct bank and blew up all 4 circuits..
Linemanundergroundworld
1.9K views • 7 months ago
14:52
Cut & kick old pole, replaced with new pole same spot
Linemanundergroundworld
2.3K views • 7 months ago
10:45
Removing the secondary 3/750 and 1/350 cables, hopefully no one got hurt raiding the panels.
Linemanundergroundworld
1.2K views • 7 months ago
11:39
High school upgrade of voltage and equipment and cable#
Linemanundergroundworld
2K views • 7 months ago
10:08
Hit pole and going to put up a temp transformer to parallel them and remove the one on the hit pole.
Linemanundergroundworld
9.8K views • 7 months ago
3:03
Mylarballoon on the 4.8 kv
Linemanundergroundworld
778 views • 7 months ago
9:00
Strip out day overhead lines 3 poles, materials , removing cable and riser 3/c 1m AL cable,
Linemanundergroundworld
1.5K views • 7 months ago
8:24
New construction of 780 unit apartment complex
Linemanundergroundworld
1.3K views • 7 months ago
12:54
There wasn’t any flatline in the ducts so we called the Dirtdawgs to come out and blow it in for us
Linemanundergroundworld
2.6K views • 8 months ago
12:05
pilc service one phase is working and over 200ft, side of the hill and under the tennis court
Linemanundergroundworld
693 views • 8 months ago
8:58
The riser was cut into, the voltage was 4.8kv and not the 120/240 they where looking for.
Linemanundergroundworld
3.2K views • 8 months ago
11:44
New house and new under underground service to the pole
Linemanundergroundworld
1.5K views • 8 months ago
3:50
While on another job of the day and your entering stations, inspect and repair or turn them in.
Linemanundergroundworld
687 views • 9 months ago
3:10
Pothead cable and traced it back to the station to be removed. 
Linemanundergroundworld
619 views • 9 months ago
14:34
Upgrading the panel and going underground service and deleting the overhead service.
Linemanundergroundworld
1.8K views • 9 months ago
4:24
Removing temp 4.8kv cable from the transformer’s
Linemanundergroundworld
684 views • 9 months ago
7:35
Prepping the 34.5kv switch to be pole mounted
Linemanundergroundworld
1K views • 9 months ago
3:31
Drilling down to set a pole and found a holding tank or reservoir for maybe oil or something
Linemanundergroundworld
992 views • 9 months ago
27:57
Easy said than done replacing underground service..
Linemanundergroundworld
2.5K views • 9 months ago
22:12
Business needed all this equipment to get the necessary power it required for there factory. 
Linemanundergroundworld
547 views • 9 months ago
24:44
Customer said the lights were flickering and dimming also, has pilc service 
Linemanundergroundworld
644 views • 10 months ago
10:17
Service intercept for the remodel of the fire station
Linemanundergroundworld
369 views • 10 months ago
8:50
Chasing new cable and pulling with the old cable to keep the orange fiber optic conduit in place ..
Linemanundergroundworld
896 views • 10 months ago
13:52
Pulling in multiple spans with two different trucks
Linemanundergroundworld
740 views • 10 months ago
13:31
New panel and new 750/350 secondary cable and make up the hand hole and energized from the vault..
Linemanundergroundworld
929 views • 10 months ago
4:18
E.V. Station is getting new cable and energized for the electric cars
Linemanundergroundworld
490 views • 10 months ago
8:03
Pulling in 34.5kv within the station and not as easy as the print made it look like
Linemanundergroundworld
1.3K views • 10 months ago
17:57
Called the aka Dirtdawgs to blow a new string do to the string was cut on both conduit’s..
Linemanundergroundworld
760 views • 10 months ago
18:01
New equipment new 34.5kv to power up new panels to an new area of downtown Los Angeles…
Linemanundergroundworld
660 views • 10 months ago
Load More