18:15
APH OIL CIRCULATION SYSTEM| SUPPORT & GUIDE BEARING| OIL CIRCULATION LINE DIAGRAM| INTERLOCKS|
156 views • 2 days ago
13:43
ROTOR DRIVE UNIT IN AIR PRE HEATER (APH)| IT'S COMPONENTS| START PERMISSIVE| INTERLOCK & PROTECTION|
111 views • 5 days ago
27:34
AIR PRE-HEATER ROTOR SEALING SYSTEM| AIR LEAKAGE|TYPE OF SEALING SYSTEM|RADIAL,AXIAL,BY PASS SEALING
196 views • 5 days ago
16:54
LJUNGSTORM AIR PRE-HEATER| CONSTRUCTION DETAILS| PART-1| ROTOR ASSEMBLY| HEATING ELEMENTS|
148 views • 6 days ago
25:20
AIR PREHEATER (APH)| IT'S IMPORTANCE IN THERMAL POWER PLANT|TYPE OF APH| RECUPERATIVE & REGENERATIVE
260 views • 7 days ago
14:31
BOILER LDO/HFO GUN START/ STOP SEQUENCE| HEA IGNITOR ROD| BASIC INFORMATION|
264 views • 13 days ago
25:43
LDO/HFO LINE DIAGRAM STARTING FROM FOPH TO OPERATING FLOOR AT BOILER| LOTV, HOTV, HORV, LOCV ,HOCV |
195 views • 2 weeks ago
25:00
TYPES OF FUEL OIL USED IN THERMAL POWER PLANT| LDO| HFO| LSHS| PROPERTIES | FLASH POINT| POUR POINT|
182 views • 2 weeks ago
11:49
ISOLATION PROCEDURE OF HP HEATERS IN 500 MW THERMAL POWER PLANT| STEP BY STEP OPERATION DETAILS|
172 views • 2 weeks ago
38:18
CHARGING PROCEDURE OF HP HEATERS IN 500MW THERMAL POWER PLANT| STEP WISE OPERATION| FULL DETAILS|
423 views • 2 weeks ago
20:28
ACTIVITIES TO BE DONE WHEN TURBINE SPEED SLOW DOWN IS OBSERVED| IMPORTANT FOR DESK ENGINEER|DETAILS|
311 views • 3 weeks ago
18:34
WHAT IS COASTING DOWN OF TURBINE| POINTS REQUIRED TO BE CHECKED DURING COASTING DOWN OF TURBINE|
274 views • 1 month ago
19:32
LINE DIAGRAM & CHARGING PROCEDURE OF APRDS SYSTEM| CHARGING FROM INTERCONNECTION LINE OF OTHER UNIT
329 views • 1 month ago
18:35
WHAT IS APRDS SYSTEM| IT'S IMPORTANCE IN THERMAL POWER PLANT| COMPONENT| HT & LT HDR| FULL DETAILS|
234 views • 1 month ago
21:57
CHANGE OVER PROCEDURE FROM TDBFP TO MDBFP IN RUNNING UNIT| DRUM LEVEL CONTROL| STEPWISE OPERATION|
297 views • 1 month ago
43:17
SEQUENCE OF OPERATION FOR BOILER WILL REMAIN LIVE WHILE TURBINE OUT OF BAR DURING SOME CONDITION|
429 views • 1 month ago
15:29
STANDARD OPERATING PROCEDURE OF CHANGE OVER FROM HG TO EHG IN KWU TURBINE| STEPWISE OPERATION|
186 views • 1 month ago
26:09
STANDARD OPERATING PROCEDURE OF CHANGE OVER FROM EHG TO HG| FULL DETAILS| FOR BEGINNERS | 500MW|
211 views • 1 month ago
32:57
FLAME FAILURE TRIPPING OF BOILER| CONDITION FOR VOTING NO FLAME|LOGIC DIAGRAM WITH FULL EXPLANATION|
507 views • 1 month ago
13:26
FLAME SCANNER INDICATION LOGIC| IT'S CRITERIA FOR SHOWING FLAME/ NO FLAME| FSSS | BASIC DETAILS|
286 views • 1 month ago
8:18
WHAT IS POST PURGE FAN TRIP IN BOILER| IT'S CONDITION| BASIC INFORMATION WITH LOGICAL DIAGRAM|
288 views • 1 month ago
15:47
WHAT IS FLAME SCANNER IN POWER PLANT| HOW DOES IT WORK | INTERNAL COMPONENTS| BASIC INFORMATION|
468 views • 2 months ago
9:00
FIRST OUT TRIP CONDITIONS OF BOILER| BOILER PROTECTION SYSTEM| BASIC INFORMATION FOR BEGINNERS|
302 views • 2 months ago
0:34
HOW TO GIVE MECHANICAL HAND BARRING TO TURBINE| TURBINE|
262 views • 2 months ago
31:43
BOILER PROTECTION SYSTEM| PART-2| HOW DOES THE MFT TRIP THE BOILER| TRIPPING CRITERIA| FULL DETAILS
606 views • 2 months ago
28:22
BOILER PROTECTION SYSTEM| FUNCTION OF MFT| MFT ACTION ON BOILER PROTECTION| FULL DETAILS|
776 views • 2 months ago
14:56
BOILER PURGING| DEFINITION OF PURGING| WHY DO WE PURGE THE BOILER|PURGE PERMISSIVE| BOILER EXPLOSION
418 views • 2 months ago
13:37
FILLING & INITIAL OPERATION OF AIR SIDE SEAL OIL CIRCUIT WITH STEP BY STEP OPERATION| FULL DETAILS|
164 views • 3 months ago
12:16
Filling and Initial Operation of Hydrogen Side Seal Oil Circuit| Step by step Operation procedure|
316 views • 3 months ago
15:41
INTERLOCKS & PROTECTION OF SEAL OIL SYSTEM| AC SOP(AIR SIDE) ,DCSOP & HYDROGEN SIDE SOP|FULL DETAILS
235 views • 3 months ago
Load More