Published On Jan 7, 2023
This is the EPISODE 7 of a complete barndominium build. During this video we install all the underground plumbing and dig access points for water and electrical. We are going to bring a COST BREAKDOWN in every video during this build series. The Mad County Standard is a 2,300 square foot 2-story post frame construction home (39’x36′) and garage (32’x24′) with a wrap around porch. It has a main floor master with a total of 3 bedrooms and 3 1/2 bathrooms.
MAD County Std Playlist
• NEW BUILD | MAD County Standard | Vir...
Patreon Build Group
/ mrpostframe
Design Services
[email protected]
0:00 Series Intro
0:46 Project Intro
1:39 String Lines
4:47 Main Drain/Waste Pipe
5:45 Marking Drain + Toilet Locations
5:59 Vents
8:39 Laying Pipe
11:06 Water Supplies
11:20 Plumbing Walk Through
19:50 Cost Breakdown
20:06 Closing
Search Our Website By Project or Room
MRPostFrame.com
Amazon Store | Project Tools Listed by Category
www.amazon.com/shop/marshallremodel
Finishes, Fixtures, Decor, + More
https://www.shopltk.com/explore/MRPos...
Daily Updates
https://linktr.ee/mrpostframe
Mad County Build Series 100+ Videos
• Mad County Build
Thanks for stopping by our channel! We are self building our family of 5 a post frame barndominium in Iowa along with the life we’ve always dreamed of.
The goal of our channel is to inspire others to build their dream by providing education on construction and an in depth look at how we’ve gotten to this place.
Email:
[email protected]
Mailing:
PO Box 11
Winterset, IA 50273
#barndominium #postframe #selfbuild #construction