Published On Jun 8, 2017
This is the installation video for the new 014-220. Hoist-A-Top Crank w/ Dual Line Crank Unit.
Introduction and Unboxing: 0:00
Frame Assembly: 02:45
Pulley Installation: 08:02
Prep for Crank Unit Mounting: 12:50
Crank Disassembly: 14:13
Crank Wall Mounting: 15:24
Pulley Ceiling Mounting: 18:08
Cable Installation: 23:00
Attaching Cable to the Lifting Frame: 28:52
Using a Drill to Raise and Lower Lifting Frame: 32:52
Balancing the Lifting Frame: 33:33
Removing Your Top: 35:41
show more