Published On Feb 17, 2020
Wanted to show our audience what a 'typical' day of pre-chlorinated pipe bursting looks like when replacing water main in a Texas residential neighborhood. This pipe burst entails replacing 650 feet of 10-inch cast iron water main with new 10-inch HDPE pipe.
Pipe Bursting results included:
• Limited noise & dust
• Residents drove in/out of driveways
• No traffic disruption/side streets remained open
• Water service maintained with temporary by-pass
• Limited civil engineering required as process follows existing utility path
• 86% less digging vs. open cut
• No mailboxes, trees or landscaping were disturbed
• Fast track project schedule as 500 to 700 feet replaced per day
►Follow Online:
Instagram: / murphypipelines
LinkedIn: / murphypipelines
Facebook: / murphypipelines
Twitter: / murphypipeline
Website: https://www.murphypipelines.com/
#trenchless #pipebursting #watermain