Building a boulder retaining wall with a self erecting tower crane
Jake Rosenfeld Jake Rosenfeld
10.7K subscribers
11,935 views
0

 Published On Mar 31, 2024

This is the second job I had going on at the Modern House build this week. I tried my best to keep them separate and thought about blending the two into one but there was just too much footage so here you go. This is a secondary retaining wall at the uphill side of the property to finish off the pile wall. The top boards will be pulled and the piles trimmed down to grade and then 18" of dirt to meet up with the existing hill. I am just the crane operator on this job and tried to capture as much of it as i could while running back and forth. I did manage to get a little roof sheeting done while I was waitng for things to get rolling and then inspectors and engineers to show up along the way. Thanks for tuning in and we'll see you on the next one:-)

show more

Share/Embed