Garage Conversion Episode 2 (Stud Work)
Elliot Humphreys Elliot Humphreys
682 subscribers
21,043 views
0

 Published On Jun 10, 2020

In this episode, we are erecting the stud walls that will form the cavity wall. A moisture barrier or DPM has been put up behind the stud to ensure no moisture or damp comes through the wall. In building the wall it has also enabled us to insulate the wall with 100mm of PIR insulation ready for the first fix electrics and plumbing.

In the Next episode, we will be boarding the walls ready for the knock through.

I hope you find this useful.

show more

Share/Embed