PAVING A DAY CARE PARKING LOT - 3 DAY PROJECT: Rip Out, First Lift & Second Lift
21,953 views
0

 Published On May 12, 2023

For our final project of the 2022 paving season, we paved a day care parking lot. We ripped out the existing parking lot, graded it, then paved two lifts of asphalt.

Featured Equipment:

- 2022 Yanmar VIO 35 Mini Excavator
- 2020 RD12 Wacker Neuson Roller
- 2022 Cat CB 2.7 Roller
- 2019 Mauldin Paver 1550 D
- 2022 Weiler Paver P65
- 2022 Cat Skidsteer 262 D3
- 2021 Wacker Neuson Diesel Plate 6555
- 2022 Yanmar 10 Ton Excavator with Rototilt R3
- 2022 Western Star 4900 Tri Axle
- 2022 International HX Tri Axle

show more

Share/Embed