PART L COMPLIANT CONCRETE FLOOR STEP BY STEP WE ARE BACK ON THE ABANDONED CONSERVATORY BASE.
WE STONE UP USING 40 MM DOWN MOT HARDCORE THEN COMPACT WITH A WACKER PLATE. NEXT IS THE SAND BLINDING TO PROTECT THE 1ST LAYER OF DPM FROM BEING PUNCTURED BY THE HARDCORE. NEXT WE INSTALL THE 25 MM JABLITE COLD BRIDGING STRIP AROUND ALL EXTERNAL PERIMETER WALLS . NEXT IS A LAYER OF 1200 GAUGE DPM THEN THE 100 MM THICK PIR INSULATION. NEXT IS THE FINAL DPM THEN LASTLY THE 130 MM THICK CONCRETE FLOOR IS BARROWED IN AND POURED. ONCE IN WE THEN TAMP THE CONCRETE AND FINALLY TROWEL IT UP, WE USE A LIGHT WEIGHT 6 FOOT LEVEL.... ENJOY πŸ‘πŸ½πŸ§±