Published On Nov 15, 2023
The production phase will begin for the Su-75 Checkmate single-engine light fighter program. As previously disclosed by UAC, the aircraft’s prototypes are expected to surface in 2024–2025, followed by a pilot batch in 2026. The serial deliveries of this new fighter aircraft are scheduled to commence between 2026 and 2027.
#Russia #Checkmate #Su75 #stealthfighteraircraft
show more